Spring Farm Release Area Wastewater

Delivering deep sewer infrastructure and tunnelling support works to enable wastewater servicing for the Spring Farm growth precinct.
Sydney Water
Spring Farm, Camden Region, New South Wales

Deep Shaft Construction + Sewer Manhole Infrastructure

[Project Background]

Wastewater Infrastructure for a Growing Residential Precinct

As part of the NSW Government’s South West Growth Centre program, new wastewater infrastructure was required to service residential development across the Camden region. The Spring Farm precinct required new sewer lead-in infrastructure to connect emerging residential developments to the broader sewer carrier network.

The project involved constructing deep shaft infrastructure and sewer manholes to support micro-tunnelling works and enable the installation of the new wastewater carrier connection.

[Scope Of Works]
Operating in Sensitive and Live environments

Delivery of shaft structures and supporting sewer infrastructure for the Spring Farm growth precinct.

Construction of caissons and sheet-piled shafts up to 14m deep
Installation of HDPE-lined sewer maintenance structures
Temporary works and hydraulic bracing systems for deep excavations
Coordination of tunnelling and carrier pipe installation works
Project Technical Snapshot

Construction of deep shaft infrastructure and sewer manholes to support tunnelling works for new wastewater carrier connections.

Caisson Shaft up to 14m Deep Sheet-Piled Shafts up to 10m Deep
Caisson Shaft up to 14m Deep Sheet-Piled Shafts up to 10m Deep
Manholes Constructed
10 Cast-in-Situ Sewer Manholes DN1500 HDPE-Lined
Tunnelling Support Works
Launch and Receive Pits for Micro-Tunnelling Operations
[Outcome / Key Features]
Deep Shaft Infrastructure Delivered for Sewer Network Expansion
Outcome
  • Construction of deep caisson shaft infrastructure reaching 14 metres in challenging sandy and groundwater conditions
  • Installation of sheet-piled shafts up to 10 metres deep to support sewer infrastructure works
  • Construction of 10 DN1500 HDPE-lined sewer manholes
  • Launch and receive pits constructed for micro-tunnelling operations
  • Installation of PVC carrier pipes between shafts through coordinated tunnelling works
Key Features
  • Caisson shaft methodology implemented to safely construct infrastructure beneath high voltage power corridors
  • Telescopic excavator with clam-shell bucket used for deep shaft excavation
  • Hydraulically braced temporary works installed to support sheet-piled excavations
  • Coordinated construction sequencing with the micro-tunnelling contractor
  • Manhole construction staged in line with shaft excavation and backfilling activities
  • Innovative safe access system using intermediate platforms and davit arms recognised by Sydney Water
[Environmental Responsibility]
No items found.
Partner With a Specialist in Critical
Water Infrastructure
If your project demands certainty, compliance, and disciplined delivery within live water networks, we’re ready to engage.
Contact Us
Contact Us