Richmond System Wastewater Upgrade

Delivering major wastewater rising main infrastructure to support regional growth and network consolidation in the Richmond precinct.
Sydney Water
Richmond – North Richmond, New South Wales

7km Wastewater Rising Main

[Project Background]

Strengthening Wastewater Infrastructure for Regional Growth

Rapid population growth across the Richmond and North Richmond precincts required significant upgrades to the wastewater network to meet future demand. Sydney Water initiated the Richmond System Wastewater Upgrade to consolidate the two existing wastewater systems and transfer flows to the Richmond Water Recycling Plant.

The project involved constructing new rising main infrastructure and upgrading the pumping station to allow wastewater flows from North Richmond to be transferred to the upgraded treatment facility.

‍

[Scope Of Works]
Operating in Sensitive and Live environments

Construction of new wastewater transfer infrastructure supporting increased servicing capacity across the Richmond precinct.

Installation of 7km DN560 wastewater pressure main infrastructure
Construction of gravity sewer amplification works across the North Richmond network
Delivery of a new high-capacity wastewater pumping station and wet well
Trenchless crossings beneath waterways and live rail infrastructure
Project Technical Snapshot

Construction of a major wastewater pressure main connecting the North Richmond and Richmond wastewater systems.

7km Wastewater Pressure Main
7km Wastewater Pressure Main
Pipe Diameter
DN560 PE100 PN16
Major Crossings
Hawkesbury River · Redbank Creek · Richmond Rail Line
[Outcome / Key Features]
Major Rising Main Infrastructure Delivered
Outcome
  • Installation of 7km DN560 PE100 wastewater pressure main
  • Construction of a new high-capacity wastewater pump station replacing SPS0096
  • Pump station capacity increased from 90L/s to 250L/s
  • Integration of the new rising main into the Richmond Water Recycling Plant network
  • Upgrade works to existing gravity sewer infrastructure within the North Richmond system
Key Features
  • Trenchless pipeline installation across Hawkesbury River, Redbank Creek and the Richmond rail corridor
  • Construction of a 20m deep wet well pump station structure
  • Delivery of works within live operating wastewater treatment facilities
  • Construction undertaken near residential areas, schools and active transport corridors
  • Detailed traffic and stakeholder management required across constrained construction areas
  • Environmental management measures implemented across wetland and waterway corridors
[Environmental Responsibility]
Managing works within environmentally sensitive areas
Construction activities were carefully managed in environmentally sensitive areas including wetlands and waterway corridors. Environmental controls and monitoring procedures were implemented to protect surrounding ecosystems while delivering the new wastewater infrastructure.