[Project Background]

Replacing Emergency Pumping Infrastructure

The Northmead Pump Station replacement project was initiated to replace a temporary pump station that had previously been installed under emergency conditions. The new infrastructure was designed to restore long-term operational reliability to the wastewater network in the area.

Killard was engaged to deliver enabling works and bypass infrastructure to support the construction of the new pump station and ensure continuity of wastewater flows during the replacement process.

‍

[Scope Of Works]
Operating in Sensitive and Live environments

Construction works supporting the replacement of temporary wastewater pumping infrastructure at Northmead.

Construction of bypass pipeline systems and associated sewer pipework
Installation of dual OD630 PE rising mains and gravity sewer connections
Connection works to existing Sydney Water infrastructure
Delivery of civil, FRP, and mechanical construction works
Project Technical Snapshot

Delivery of bypass infrastructure and enabling works for the construction of a new wastewater pump station.

OD630 PE Temporary Bypass Pipelines
OD630 PE Temporary Bypass Pipelines
Rising Main Installation
Dual OD630 PE Rising Mains
Associated Sewer Works
DN200 Gravity Sewer Connection
[Outcome / Key Features]
Enabling Works for Pump Station Replacement
Outcome
  • Construction of OD630 PE temporary bypass pipelines to maintain system operations
  • Installation of dual OD630 PE rising mains connected to the new pump station system
  • Installation of DN200 gravity sewer connection infrastructure
  • Construction and installation of dropper pipe into the existing inlet manhole to support bypass operations
  • Integration of works with the existing Sydney Water wastewater network
Key Features
  • Works delivered within a complex site located at the confluence of three waterways
  • Construction sequencing developed to address restricted site accessibility
  • Multi-disciplinary delivery including civil, mechanical, FRP and pipeline installation works
  • Early works package delivered while design development was still ongoing
  • Close collaboration with project stakeholders to ensure constructability and design feasibility
[Environmental Responsibility]
Managing construction within a sensitive waterway environment
Construction works were delivered within a site located at the confluence of three waterways. Environmental controls were implemented throughout the project to manage site access, protect surrounding waterways, and ensure safe delivery of the enabling infrastructure.