[WATER OUR FOCUS]

Goulburn Reuse Scheme – Wastewater Treatment Plant Upgrade

Delivering treatment plant infrastructure to support recycled water irrigation and sustainable water management in Goulburn.
Goulburn Mulwaree Council
Goulburn, New South Wales

Reuse Scheme Infrastructure

[Project Background]

Supporting Sustainable Water Reuse Infrastructure

Goulburn Mulwaree Council initiated upgrades to its Wastewater Treatment Plant as part of a broader Reuse Scheme designed to supply treated water for irrigation across new public parks.

The project aimed to reduce reliance on potable water while decreasing the volume of treated wastewater discharged into the Wollondilly River, improving long-term environmental outcomes for the region.

[Scope Of Works]
Operating in Sensitive and Live environments

Construction of storage, pumping, and distribution infrastructure supporting the expansion of the Goulburn Reuse Scheme.

Construction of two 650kL concrete storage reservoirs
Installation of pumping station, mechanical, and electrical infrastructure
Installation of DN450 gravity feed pipeline and associated pipework systems
Testing, commissioning, automation, and SCADA integration works
Project Technical Snapshot

Design and construction of treatment plant infrastructure supporting recycled water storage, pumping and distribution.

2 × 650kL Concrete Reservoirs
2 × 650kL Concrete Reservoirs
Pumping System
Multistage Variable-Speed Pumping Station
Pipeline Installation
DN450 DICL Gravity Feed Pipeline
[Outcome / Key Features]
Delivered Infrastructure for Recycled Water Distribution
Outcome
  • Design and construction of two 650kL recycled water storage reservoirs
  • Installation of multistage variable-speed pumping station infrastructure
  • Installation of DN450 ductile iron gravity feed pipeline connecting treatment plant and storage infrastructure
  • Mechanical, electrical and automation systems integrated with Council SCADA network
  • Testing and commissioning of all plant infrastructure and distribution systems
Key Features
  • Construction of treatment plant infrastructure supporting recycled water irrigation schemes
  • Integration of storage, pumping and distribution infrastructure within the existing WWTP network
  • Implementation of erosion and sedimentation control measures during construction
  • Geotechnical investigation and engineered earthworks to support reservoir structures
  • Full site restoration and reinstatement following completion of works
[Environmental Responsibility]
Supporting sustainable water reuse
The reuse scheme enables treated wastewater to be reused for irrigation, significantly reducing reliance on potable water while decreasing discharge volumes to the Wollondilly River. The project supports long-term water conservation and sustainable resource management across the Goulburn region.
No items found.
Partner With a Specialist in Critical
Water Infrastructure
If your project demands certainty, compliance, and disciplined delivery within live water networks, we’re ready to engage.
Contact Us
Contact Us