Goulburn Reticulation Mains Upgrade

A multi-year renewal program modernising the Goulburn water reticulation network to restore reliability, reduce water loss, and support long-term service demand.
Goulburn Mulwaree Council
Goulburn Mulwaree LGA, New South Wales

10km+ Network Renewal (DN100–DN375)

[Project Background]

Modernising an Aging Water Network

The existing water reticulation system across the Goulburn Mulwaree LGA had reached the later stages of its operational life, with aging pipes contributing to leaks, bursts, and ongoing water loss. These challenges affected network reliability and increased operational costs for the Council.

To address these issues, Goulburn Mulwaree Council initiated a long-term infrastructure renewal program focused on replacing aging components, improving system performance, and ensuring the network could meet future service demands. Following a competitive procurement process, Killard was awarded a three-year contract to deliver the renewal program, later extended by an additional two years in recognition of successful delivery and continued performance.

[Scope Of Works]
Operating in Sensitive and Live environments

Comprehensive renewal and maintenance works improving the reliability and operational performance of the Goulburn reticulation system.

Renewal of over 10km of potable water infrastructure
Installation of PVC, DICL, and Polyethylene water mains
Open cut and trenchless pipeline construction across active urban areas
Pressure testing, disinfection, and connection to live network assets
Project Technical Snapshot

A comprehensive reticulation renewal program combining investigation, open-cut installation, and trenchless construction to modernise critical sections of the Goulburn water network.

10km+
10km+
Pipe Diameter
DN100–DN375
Contract Duration
3-Year Program + 2-Year Extension
[Outcome / Key Features]
Program Delivery Across a Live Municipal Network
Outcome
  • Renewal of 10km+ of aging water reticulation infrastructure across the Goulburn Mulwaree LGA
  • Replacement of deteriorated AC and CICL pipelines with modern PVC, DICL, and Poly pipelines
  • Installation delivered through open-cut construction and trenchless methods including HDD, bed boring and micro-tunnelling
  • Hydrostatic pressure testing and disinfection of newly installed mains prior to network integration
  • Isolation of existing network sections and transfer of house service connections onto newly installed pipelines
Key Features
  • Comprehensive network assessment and investigation using NDD vacuum excavation
  • Infrastructure planning and prioritisation based on network condition and operational needs
  • In-house traffic management and construction staging across active urban corridors
  • Continuous stakeholder engagement with residents and businesses throughout construction
  • Contract extension awarded by Council following successful delivery of the initial program phase

‍

[Environmental Responsibility]
No items found.
Partner With a Specialist in Critical
Water Infrastructure
If your project demands certainty, compliance, and disciplined delivery within live water networks, we’re ready to engage.
Contact Us
Contact Us