Cobar Reticulation Water Mains Upgrade

Upgrading critical town water infrastructure to restore supply reliability and improve potable water quality for the Cobar community.
Cobar Shire Council
Cobar, New South Wales

7km Reticulation Pipeline Replacement (DN100–DN200)

[Project Background]

Renewing Essential Town Water Infrastructure

Cobar Shire Council initiated a town-wide water main renewal program to replace aging cast iron pipelines that had deteriorated over time. The existing network was experiencing recurring blockages, breaks, and discolouration caused by internal deposit build-up.

The upgrade focused on replacing approximately 7 kilometres of pipeline to improve water quality, restore network reliability, and ensure the system could deliver adequate flow capacity for essential services, including firefighting requirements.

‍

[Scope Of Works]
Operating in Sensitive and Live environments

Replacement of ageing water mains to improve water quality, network reliability, and firefighting capacity for the Cobar community.

Replacement of over 7km of ageing cast iron water mains
Installation of new DN100–DN200 potable water pipelines
Rail crossing works including pipejacking and concrete encasement installation
Network commissioning and integration with existing town infrastructure
Project Technical Snapshot

Key infrastructure upgrades restoring reliability and performance across the Cobar water network.

7km Reticulation Water Main
7km Reticulation Water Main
Pipe Diameter
DN100–DN200
Installation Depth
Up to 3.4m (rail crossing section)
[Outcome / Key Features]
Delivered Critical Regional Network Renewal
Outcome
  • Replacement of over 7km of aging cast iron water mains across the Cobar township
  • Installation of new DN100–DN200 reticulation pipeline improving system reliability and flow performance
  • Laser-guided boring and pipejacking used to safely install pipeline beneath active railway infrastructure
  • Concrete encasement of pipeline 3.4m beneath the railway line ensuring long-term structural protection
Key Features
  • Regional water infrastructure upgrade delivered within an operating town network
  • Restoration works completed across affected streets and service corridors
  • Community impact minimised throughout construction activities
  • Immediate improvement in potable water quality experienced by local residents
[Environmental Responsibility]
Water reuse implemented during drought conditions
During construction in drought conditions, water used for pipe disinfection was captured, recycled, and reused through vacuum-jetter combination trucks for dust suppression and jetting activities. This approach reduced water waste while supporting safe construction operations in a water-constrained environment.