Aspect Industrial Estate – Temporary Wastewater Services

Delivering temporary wastewater storage and pump-out infrastructure supporting the development of a major industrial estate in Western Sydney.
Aspect Industrial Estate Development
Kemps Creek, New South Wales

Industrial Development Utilities

[Project Background]

Supporting Infrastructure for Major Industrial Development

The Aspect Industrial Estate in Kemps Creek is one of the first industrial subdivisions delivered under the State Significant Development (SSD) framework. The 55-hectare development will host large-scale industrial facilities, including one of the largest warehouse buildings in the southern hemisphere.

Temporary wastewater infrastructure was required to support early-stage operations and ensure reliable sewer services during development works.

[Scope Of Works]
Operating in Sensitive and Live environments

Construction of temporary wastewater storage and supporting utility infrastructure within the Aspect Industrial Estate development.

Installation of large-scale fibreglass wastewater storage tank infrastructure
Construction of sewer, drainage, and associated electrical utility works
Bulk earthworks, excavation, and engineered fill placement works
Testing, commissioning, and integration with existing utility infrastructure
Project Technical Snapshot

Construction of temporary wastewater storage and pump-out infrastructure supporting industrial development works.

3.5m Diameter × 26.5m Fibreglass Storage Tank
3.5m Diameter × 26.5m Fibreglass Storage Tank
Access Infrastructure
4 × DN1050 Access Manways
Supporting Works
Interim Operational Pump-Out Station (IOP)
[Outcome / Key Features]
Temporary Wastewater Storage Infrastructure Delivered
Outcome
  • Installation of fibreglass wastewater storage tank infrastructure supporting temporary sewer services
  • Construction of Interim Operational Pump-Out (IOP) station for industrial estate operations
  • Integration with existing sewer infrastructure and utility services
  • Completion of hydrostatic testing, commissioning and system verification
Key Features
  • Installation of 3.5m diameter × 26.5m fibreglass storage tank
  • Construction of dual suction lines and associated sewer infrastructure
  • Import and placement of engineered fill material for tank foundation and embankments
  • Installation of four DN1050 access manways with cast iron covers
  • Delivery of associated civil works including drainage, scour protection and access platform construction
  • Compliance with Sydney Water specifications and project environmental management plans
[Environmental Responsibility]
No items found.