Shoalhaven City Council has identified that the existing Lake Conjola watermain is now reaching its end of life and requires renewal. The proposed renewal will be undertaken as part of Shoalhaven Waters capital works budget, with the section of the main to be renewed extending along the Lake Conjola Entrance Road.
Killard Infrastructure were engaged by Shoalhaven City Council in September 2020 for the replacement of approximately 2km of the existing 300 PVC main with a new 450mm HDPE.
KILLARDS PORTFOLIO
Lake Conjola – Shoalhaven Water
Project Introduction
Project Details
Client
Shoalhaven Water
Project dates
September 2020 – January 2021
Discipline
Water main replacement
Asset Owner
Shoalhaven City Council
Location
Lake Conjola NSW
Scope of Works
The following construction works are involved in the total project:
- 2030m of DN450m HDPE pipe and associated valves and fittings
- Installation of the DN300 Flow meter pit
- Installation of the pipeline in residential areas and water charge ground areas
- Identification, protection, and relocation of DN40 Low Pressure Sewer house connections
Project Features:
- 4 x 5t – 35t Excavators, Skip Trucks, Tippers, Vacuum Truck, Tool Truck, small equipment.
- 2030m of DN450 HDPE pipeline
- 20m of DN300 SINTAKOTE including 14.3 m free span crossing the Canal of one length continuous pipe with no joins